Construction
- Project Status
- DA Drawings
- Statutory Approvals
- Construction Plans, Programs, Strategies
- Project Rporting
- Complaints
Project Status
The University of Sydney have appointed a head contractor (FDC Construction & fitouts) through a competitive tender process for the design and construction of the Chau Chak Wing Museum.
The lead consultant is Architect Johnson Pilton Walker (JPW) and they have been retained by the contractor to complete and co-ordinate all design related works.
FDC Construction have commenced with site mobilisation and site establishment. It anticipated to commence construction phase in June 2018.
The University have appointed Ellen Wayland the Precinct Delivery Manager, Kate Bimson the Project Director and Christopher Burns the Project Manager. It is anticipated that practical completion of the Museum building will be achieved during Q1 2020 with an opening expected mid 2020, after University Museums have completed their curating and fit-out of exhibition displays.
DA Drawings
- JPW DA A 1001 02 GENERAL ARRANGEMENT PLAN LOWER LEVEL 2 PLAN 1
- JPW DA A 1002 02 GENERAL ARRANGEMENT PLAN LOWER LEVEL 2 2
- JPW DA A 1003 02 GENERAL ARRANGEMENT PLAN LOWER LEVEL 1 1
- JPW DA A 1004 02 GENERAL ARRANGEMENT PLAN LOWER LEVEL 1 2
- JPW DA A 1005 02 GENERAL ARRANGEMENT PLAN LOWER GROUND LEVEL 1
- JPW DA A 1006 02 GENERAL ARRANGEMENT PLAN LOWER GROUND LEVEL 2
- JPW DA A 1007 02 GENERAL ARRANGEMENT PLAN GROUND LEVEL
- JPW DA A 1008 02 GENERAL ARRANGEMENT PLAN UPPER LEVEL
- JPW DA A 1009 02 GENERAL ARRANGEMENT PLAN PLANT LEVEL
- JPW DA A 1010 02 GENERAL ARRANGEMENT PLAN ROOF PLAN
- JPW DA A 2000 02 ELEVATION SOUTH
- JPW DA A 2001 02 ELEVATION WEST
- JPW DA A 2002 02 ELEVATION NORTH
- JPW DA A 2003 02 ELEVATION EAST
- JPW DA A 3000 02 SECTION NORTH 01 1
- JPW DA A 3001 02 SECTION NORTH 01 2
- JPW DA A 3002 02 SECTION NORTH 02 1
- JPW DA A 3003 02 SECTION NORTH 02 2
- JPW DA A 3004 02 SECTION NORTH 03
- JPW DA A 3010 02 SECTION SOUTH 01
- JPW DA A 3020 02 SECTION WEST 01
- JPW DA A 3021 02 SECTION WEST 02
- JPW DA A 3022 02 SECTION WEST 03
- JPW DA A 4000 02 CAFÉ DETAIL PLAN
- JPW DA A 5000 03 SIGNAGE DETAIL ELEVATION
- JPW DA A 9000 02 SCHEDULE SAMPLE BOARD
- JPW DA L 0500 02 PUBLIC DOMAIN PLAN
- JPW DA L 0501 02 PLANT SCHEDULE
Statutory Approvals
Construction Pans, Programs, Strategies
- A5 Statement / evidence that JPW have retained
- A11 Long service levy receipt
- B1 Notice of commencement of works
- B2 Certified plans
- B7 Erosion and sedimentation control
Civil design certification
Construction program plans civil - B8 Pre-construction dilapidation reports
Construction program plans 1
Construction program plans 2
Construction program plans 3
Construction program plans combined - B10 Structural details
TE-ST-NRP-08.11
Early works CC1 design certification
TE-ST-NRP-00.00
TE-ST-NRP-00.11
TE-ST-NRP-00.12
TE-ST-NRP-01.01
TE-ST-NRP-02.11
TE-ST-NRP-02.51 - B16 Stormwater and drainage works design
C01.01
Early works CC1 design certification - B18 Construction environmental management plan
- B20 Construction noise and vibration management plan
- B22 Construction waste management plan
- B24 Construction traffic and pedestrian management plan
- B27 Complaints management system
- B28 Utility services
Ausgrid certified design
Ausgrid LT05B ASP3 design certified
TE-EW-ARP-0001
TE-EW-ARP-0002
TE-EW-ARP-0010
TE-EW-ARP-0014
TE-EW-ARP-0015
TE-EW-ARP-0016
TE-EW-ARP-0020
TE-EW-ARP-0025
TE-EW-ARP-0030
TE-EW-ARP-0040 - B31 Compliance report
- B33 Tree removal
- B34 Independent environmental audit - program
- Construction Program
- Construction Compliance Report #1 SSD 7894
Project Reporting
- B35,36,37 Independent environmental audit
- Environmental performance
Results of pre-clearance survey at the F01 Chau Chak Wing Museum construction site
Environmental Audit and Monitoring Report - Independent Environmental Audit #1 Corrective Action Plan
- Independent Environmental Audit #2 Corrective Action Plan
- Environmental Audit Report September 2018
- Environmental Management Plan
Project status report
Complaints
A complaint and enquiries procedure has been implemented, and will be maintained for the duration of the construction project; including the below measures:
- A toll-free 24 hour telephone number on which a complaint or enquiries about the carrying out of any works can be registered.
- A Postal address to which written complaints and enquiries may be sent; and
- An email address to which electronic complaints and enquiries may be transmitted
The details are as follows:
Phone Number: 1800 931 698
Email: ccwmcomplaints@fdcbuilding.com.au
Postal Address: 22-24 Junction Street, Forest Lodge NSW 2037
View the Complaints Register here.